KinnowKinnow
Sign in
Manufacturing · United Kingdom

ERP for manufacturing. BOM to dispatch, with variance and job work reconciled as you go.

From bill of materials to dispatch, with variance and subcontract work reconciled as you go instead of at the quarter end.

From early 2027
Short answer

How does Kinnow help a UK manufacturer? The bill of materials (BOM), the work order, the material issued and the finished lot sit in one record, so the cost of a run reaches your books and the gap between planned and actual material shows up the week it happens, not at the costing review. Nothing is filed, paid or posted without a person.

Your business in one paragraph

A plant turns a purchase commitment into a shipped batch. Material comes in against a purchase order, goes out to the line against a work order, some of it goes to a subcontractor and comes back, and the finished lot is costed, invoiced with VAT and dispatched. The owner's worry is rarely the machine; it is the paperwork around it: what the BOM says, what was issued, what sits at a subcontractor, and what the planner promised a customer.

Material drifts from the BOM

Actual use creeps above plan and nobody sees it until a costing review weeks later.

Material out with subcontractors

Orders are matched up by hand, and the stock sitting at the subcontractor is nobody's number.

A whiteboard for capacity

A rush order breaks the schedule because nobody could see how busy each work centre was.

Send us one BOM and one work order and we will show the variance on your numbers.

How your month runs on Kinnow

This is the path from demand to dispatch, with the buying and subcontract (job work) routines that sit under it.

#StepWhoApplicationWhere a person signs
1Order received; the credit check holds it if the customer is over limitSales managerSellCredit hold cleared by a person
2Kinnow's suggestion-only MRP (material requirements planning) breaks the BOM down against stock and open orders and proposes what to make and buyProduction plannerMakePlanner confirms; nothing is released automatically
3Purchase request, then purchase order; the supplier is approved before releaseProcurement officerBuyA purchase order above a value you set needs approval
4Material received; an incoming quality inspection is created when it is accepted; failures raise an NCR (non-conformance report)Stores, QC inspectorStock & Ship, MakeA person approves what happens to a failed lot
5Work order released; the capacity board shows how loaded each work centre isProduction plannerMakeA run above a quantity you set needs approval
6Material issued; operators start and complete operations at the terminalShop-floor operatorMakeThe operator is named on each step
7Job work: material goes out to a subcontractor on a job-work order and comes back; the agent checks the quantities add upStores, subcontract coordinatorMakeShort-close or write-off is a person's action
8Work order completes; the cost of the run moves from work in progress (WIP) to finished goods in your booksAutomaticAccountCost variance reviewed by finance
9Scrap above the limit is flagged; write-offs go for approvalPlant managerStock & ShipA write-off above a value you set needs approval
10Dispatch and invoice, with the invoice checked against the VAT invoice rules; month-end close and the VAT return draft (groundwork completed before launch)Accounts executive, finance managerSell, Comply, AccountReturn and close signed by a person

What the industry setup includes

The ready-made setup for manufacturing (we call it an industry pack) has 6 safeguards, 4 lists of who signs off, in order, 9 reports, 13 starter questions for Ask Kinnow, 10 agents and 20 ready-made routines. For the United Kingdom it is completed with early-access customers, so the limits below are set with you, not preset.

SafeguardEffectWhy it is there
Production run above a quantity you setNeeds approvalCommits material and machine time before anyone has seen the demand
Purchase order above a value you setNeeds approvalBuying raw material is where margin is won or lost
Stock write-off above a value you setNeeds approvalEither a real loss or a stock error; both need a name against them
Manual journal above a value you setNeeds approvalChanges the books without a source document
Scrap above a number of units you set on a work orderWarningScrap is material already paid for and thrown away
Customer credit limit above a value you setWarningCredit is a decision, not data entry

The ready-made routines include Demand to dispatch, Buying raw material and Stock count to write-off.

What the UK country setup adds

A separate United Kingdom setup carries the VAT and payroll controls. Its sign-off steps cover VAT returns, VAT invoices, payroll runs, journals, write-offs and purchase orders.

ControlWhat happensWhy it is there
VAT returnSign-off by a named person before the return is filedKinnow prepares the working and a person files the return
Large VAT invoiceRead before it is raised; a credit note puts it rightA wrong invoice is corrected openly, on the record
Manual journalA second person signsMaking Tax Digital (MTD) expects an unbroken digital trail
Stock write-offReview, with the VAT bad-debt relief deadline shownA write-off can carry a VAT consequence
Purchase orderReview where the construction reverse charge may applySuch an invoice carries no VAT
Timesheet overtime beyond the working-time averageWarningShift overtime needs the opt-out on file

Processes, built in

Good-practice processes come switched on, each printable as a step-by-step procedure.

Demand to dispatchMonth-end closeAccess request to grantWorkflow change to liveDocument to signedSee the processes →

Ask us to walk a work order from BOM to finished lot on your own item.

Agents for Manufacturing

Build / Make

BOM Variance

Flags jobs where the material actually used differs from the plan by 5% or more, up or down.

Helps: Production planner
Make

Production Schedule Optimizer

Orders work orders by shortest processing time, as a suggestion for a planner to adopt.

Helps: Production planner
Make

Material shortage

Checks a work order's parts against stock on hand and shows any shortfall before the order is released.

Helps: Production planner
Make

Costing variance

Compares a work order's actual cost with the plan and flags material overruns beyond the range you set (10 per cent to start with).

Helps: Finance manager
Make

Subcontract reconciliation

Checks that material sent to a subcontractor equals what was used plus scrapped plus returned plus still out, and lists orders that do not balance.

Helps: Stores, subcontract coordinator
Make

Work-centre capacity watch

Says when to open the capacity board. A load that looks comfortable while orders have no routing is reported as unreliable, not healthy.

Helps: Production planner
Stock

Stock Forecaster

Forecasts demand for the next 30, 60 and 90 days for each item and warehouse, with a suggested safety stock and reorder point. It never acts on its own.

Helps: Data analyst
Buy

3-way match

Matches the purchase order (PO), the goods receipt and the supplier's bill line by line, and holds the bill until any difference is sorted out.

Helps: Accounts executive

Each agent is validated with each client before it works on their books, and every output waits for a person. Also included: Reject-rate watch, an agent that decides which stock to count first, and an agent that predicts maintenance.

Tax and compliance calendar for a UK manufacturer

Kinnow prepares; a person confirms and files. The UK has no rule requiring invoices to be cleared by the tax authority first; Making Tax Digital (MTD) expects digital records, which Kinnow keeps.

ObligationWhat Kinnow preparesWho confirms
VAT return (VAT100, the nine-box return)The groundwork for a nine-box document and a file, built from sales and purchase records, is completed before launch. Boxes 2, 8 and 9 apply to Northern Ireland only. A person files it through recognised software or HMRC; your adviser confirms each box before first useFinance manager, adviser
VAT filing calendarFollows your HMRC stagger group (the quarter pattern HMRC gave you), which you set up; Kinnow does not guess it. Monthly filers are supported. Due one calendar month and seven days after the period endFinance manager
VAT invoices on salesChecks the VAT number (with its check digit), date, running number, customer name, VAT in sterling and tax point. Simplified invoices are allowed up to £250 including VATAccounts executive
VAT registersSales and purchase registers and a summary by VAT rate (20%, 5%, 0%), with reverse charge on cross-border business supplies. VAT rates come from a starter list of items, not the full HMRC listAccounts executive, adviser
PAYE (tax taken from pay each month), National Insurance, pension and student loanWorked out in the pay run on an annual basis, so a mid-year joiner can differ from HMRC's running total method. Rates are kept for each tax yearHR head, adviser
Companies House confirmation statement, annual accounts, corporation tax return and ICO feeTracked as dated reminders; your adviser confirms each date. Kinnow does not prepare the return or the accountsFinance director, adviser

Ask us to run a VAT return and a month-end close on your own numbers.

What the owner can ask

Questions that come with the industry setup, typed into Ask Kinnow. Each answer names its source report and what it will cost before it runs.

  • Which work orders are behind schedule? Which work orders have no routing at all? (Work-order schedule)
  • What is my BOM cost variance this month? Which runs are over their cost variance? (Production cost variance)
  • Which materials are short for the next run? (Stock valuation)
  • What failed inspection this month? What NCRs were raised? (QC inspection register, NCR register)
  • When is my next VAT return due? Which supplier invoices are missing a VAT registration number? (VAT filing calendar, purchase register)
  • Whose overtime has pushed them past the working-time average?

Illustration · sample data

Work order · itemMaterial plannedMaterial issuedVariance
WO-0412 · Pulley housing120.0 kg128.5 kg+7.1%
WO-0415 · Gear blank64.0 kg65.0 kg+1.6%
WO-0419 · Shaft sleeve48.0 kg47.5 kg-1.0%

Numbers that matter

NumberReportWhat it tells you
Material and cost variance by runProduction cost varianceWhich runs overspent and on what
Output by item and lineOutput by itemWhat each line actually produced
Inspection failures and NCRsQC inspection and NCR registersWhere quality is leaking, and from which supplier
How loaded each work centre is, with anything above 100 per cent shown as it isWork-order schedule, capacity boardWhether the shop is over-promised
Dead stock value and purchase spendDead stock, purchase spend by categoryMoney sitting idle and where the buying goes
Output VAT by rateVAT rate summaryWhat is owed and when

Applications switched on

Generic termIn your Kinnow
production orderwork order
work in progressWIP
subcontractingjob work
quality failureNCR (non-conformance report)

Questions

Does Kinnow run MRP?

Yes, as suggestion-only MRP (material requirements planning). It breaks down multi-level BOMs against stock and open orders and proposes what to make and buy. It never creates a purchase order or work order by itself. The Production Planner turns the make recommendations into suggested work orders, and a person releases them.

Does it schedule the shop automatically?

No. A capacity board shows how loaded each work centre is, and it can show more than 100 per cent, because that is what a planner needs to know. The Production Schedule Optimizer suggests an order for the work orders, shortest job first, for the planner to accept or change. Automatic scheduling that works around machine and staff limits is not built.

Can it handle work sent out to subcontractors?

Yes. Job-work (subcontract processing) dispatch and receipt are tracked order by order, and an agent lists the orders where material sent does not equal what was used plus scrapped plus returned plus still out. Closing an order short or writing it off stays a person's action.

What stops a BOM from referring to itself?

A BOM that would loop back on itself, or run deeper than 10 levels, is refused when you save it.

Is there a shop-floor screen?

Yes. A terminal lets an operator start and complete an operation. The time is taken from the clock, and an out-of-sequence or double start is refused. It works in the phone browser; there is no offline mode or native app.

How do rejects reach the supplier?

An incoming inspection is created when goods are accepted above your limit. A failed lot raises a non-conformance report with a decision on what to do (rework, scrap, use as is, return to supplier), and the supplier's pass rate feeds a scorecard that purchasing sees.

Does Kinnow file my VAT return with HMRC?

No. The groundwork to prepare the nine-box VAT return and a file from your own sales and purchase records is completed before launch, and a person files it through recognised software or HMRC. Kinnow does not submit to HMRC. Your adviser confirms each box before first use.

How long to set up?

About two weeks to first results for one company: your lists (Masters), BOMs and opening stock in week one, agents and a first close in week two.

Show me Kinnow for manufacturing.

Answer three questions. Get the applications, the agents and a two-week plan for your business.

Book a walkthrough