ERP for engineering, construction & system integration (EPC). Tender to RA bill to handover to AMC: one project record.
Tender to RA bill to handover to AMC on one project record, so a bill goes out on certified quantities and retention does not sit uncollected. The United Kingdom edition opens in early 2027.
From early 2027 · industry pack readyHow does Kinnow help an EPC or system integration firm? One project record from tender to handover to AMC: the Bill of Quantities (BoQ) is priced and fixed as the baseline, the award creates the project, subcontractor and supplier bills are measured, RA bills go out only on certified quantities, retention is tracked, and a signed handover puts the assets under AMC.
Your business in one paragraph
An EPC firm wins a tender, prices it against a Bill of Quantities, mobilises crews and plant, and is paid in running-account bills against quantities a consultant certifies in the Measurement Book. Margin is made or lost in procurement, in variations agreed on site and not billed, and in retention that sits uncollected long after the defect-liability period ends. Compliance sits on the site: safety, inspections, non-conformances and, for power projects, state approvals. The owner is awake over the RA bill held up for a certificate, the variation nobody priced, and the handover packet that takes weeks and delays the AMC that should follow.
See one of your projects as Kinnow would hold it. Send us a BoQ and the last two RA bills.
How your month runs on Kinnow
Ten steps from tender to AMC, with the approval points marked. Nothing is billed, posted or released without a person.
- A tender is priced. The estimator imports the BoQ in Build. BoQ Pricer proposes a cost for unpriced lines from rates already on the sheet and leaves blank any line it has nothing to go on for. The bid is submitted with the priced BoQ; earnest money deposits (EMD) and bank guarantees go into one register.
- Bid or no bid. The commercial head decides after the site assessment is verified and the solution case approved. Accepting an award above the award limit you set needs an approver.
- The award creates the project. The project opens with its work breakdown structure (WBS) and BoQ. The BoQ is baselined as the budget the project is measured against. A project with no accountable owner is blocked.
- Suppliers and subcontractors are qualified. A supplier submits documents, they are reviewed, and only a qualified supplier can receive a purchase order. A PO above the purchase limit you set needs an approver, and an unapproved make is blocked at the PO and at goods receipt.
- Material is bought and received. Buy raises requirements against the BoQ, matches the supplier bill to the PO and receipt, and the project cost cockpit shows committed, actual and accrued by WBS node.
- Site progress is measured. The site engineer records the daily progress report: manpower, plant and progress. Inspections are requested at hold points; a failed inspection raises a non-conformance that must be closed with a verified corrective action.
- The consultant certifies; the RA bill is raised. Certified quantities are reconciled to the Measurement Book. The RA-Bill Reviewer checks them against the contract. The invoice is raised in Sell, VAT is applied by item code, and the certified value posts to the books.
- Variations are priced and decided. A variation is raised, advised on by the Margin Guard, and approved with its sell value and cost estimate locked.
- Retention is held, then released. Each bill holds retention. At the end of the defect-liability period the DLP Expiry Watch warns 30 and 7 days ahead and the second tranche can be released.
- Snags, handover and AMC. Snags are cleared, the Handover Composer drafts the packet from the document register, assets and quality position, the client signs it, and the assets move under AMC in Maintain.
What we set up for your projects
The ready-made setup for your industry (we call it an industry pack) holds its limits as plain numbers with no currency. In the United Kingdom edition we reset every limit in pounds with you in the first week, and they are yours to change.
| Part | What is set up |
|---|---|
| Limits and rules (10) | A project or accepted award and a purchase order above their limits need approval. An unapproved make at PO or goods receipt, a project with no accountable owner and an AMC call with no service-promise (SLA) plan are blocked. A manual journal above its limit needs approval. A credit limit above its limit and a site lease escalating above 10 per cent raise a warning. |
| Who signs off, in order (4) | Project approval, purchase approval, journal approval and award acceptance. |
| Ready-made routines (23) | Tender to cash, buying material to site, snag to closure, site visit to sign-off, subcontractor engaged to closed, award to sales order, site lease and plant hire, month-end close and others. |
| Reports (10) | Project register, milestone status, RA bills, retention outstanding, AMC register, service tickets, receivables ageing, project value by status, project cost register and cost by type. |
| Ask starters (14) | Which projects are over budget, what retention is due for release, show me pending RA bills, what have we committed on this project that we have not been billed for. |
| Your words | RA bill, snag, Measurement Book, DLP, AMC, and project or site in place of generic terms. |
Processes, built in
A full set of best-practice processes for your industry come switched on: who owns each step, which steps Kinnow enforces, and a clock on every hand-off between departments. Print any of them as an SOP.
Agents for engineering and construction
Each agent is validated with each client before it works on your books, and every output waits for a person. The industry setup also brings Subcontractor bill release review, Material Variance Watch, Punch Closure Watch and AMC Renewal.
RA-Bill Reviewer
Checks each running account (RA) bill as it is raised: whether the total certified so far goes past the contract as varied, and whether retention was withheld. It only advises; it does not post, change or stop a bill.
Variation Margin Guard
Judges a change order before approval against the margin the job was won at and flags a variation with a sell value and no cost estimate. Advisory.
BoQ Pricer
Proposes cost rates for unpriced BoQ lines from rates already on the sheet and names what it cannot price.
DLP Expiry Watch
Warns 30 and 7 days before a defect-liability period ends so retention does not sit uncollected.
Handover Composer
Drafts the handover packet from the document register, asset list and quality position and states the gaps.
Project Risk Predictor
Warns you when a project is running late, spending ahead of the work done, or billing ahead of it, measured against the baselined bill of quantities (BoQ).
BuildSafety Compliance
Built to total the serious site-safety findings not yet fixed, with their estimated penalty. The estimate and the fixed marker are set up with you.
Ask us to run the Margin Guard on your last five variations.
Statutory and compliance calendar for a contractor (United Kingdom)
Kinnow prepares; a person confirms and files. Dates are not printed here because the authority sets them and they change; Comply carries your calendar.
| Obligation | What Kinnow prepares | What stays with you |
|---|---|---|
| VAT on running-account bills | The groundwork to build the nine-box VAT return figures from the sales and purchase records for the period, as a file to download, is completed before launch. Kinnow does not submit to HMRC: a person files through HMRC-recognised software or the HMRC portal, once your adviser has confirmed the box mapping. RA bills are raised in Sell, with VAT applied by item code. | A person reviews and files. |
| Construction Industry Scheme | Tracked as a registration with a due date and a reminder for a company flagged as construction. Kinnow does not calculate CIS deductions or prepare the monthly return. | Finance head and adviser. |
| Subcontractor payments | Subcontractor bills carry retention and dues for review before release. | A person releases payment. |
| Site safety | Incident register, toolbox talks, permits and safety findings. | The safety officer investigates. |
| Statutory inspections on handed-over sites | The UK facility calendar in Maintain tracks fire risk assessment, lift thorough examination, gas safety check, electrical installation report and food hygiene registration, each with a state and due date. The periods are being verified before launch. | Arranging and renewing with the competent person. |
| PAYE, National Insurance and pension | Income tax, National Insurance, pension and student-loan deductions from rate tables held per tax year; a year with no table is refused. The UK payroll setup names the HMRC payroll filings; preparing or submitting them is not in the first release. | HR head and adviser. |
| Companies House, corporation tax and ICO fee | Confirmation statement, annual accounts, corporation tax return and ICO fee are tracked with a due date and a reminder. Kinnow files none of them. | Finance head and adviser. |
| Month-end close | Twelve checks; seven must pass. | The finance head signs. |
What the owner sees
Every answer shows its source and cost before it runs. Veil, our privacy layer, holds back bank, tax and ID numbers and swaps names for placeholders before an AI call. It covers Ask Kinnow and most agents today; the rest are being added.
| Question an owner would type | What comes back |
|---|---|
| Which projects are over budget? | Committed, actual and accrued against budget by project, with earned-value index. |
| Show me pending RA bills | Bills awaiting certification or invoice, by project. |
| How much retention is still outstanding? | Retention held, and tranches releasable. |
| Which projects have slipped their milestones? | Planned against actual with the variance. |
| What have we committed on this project that we have not been billed for yet? | The cost register of open commitments. |
| Which AMC contracts renew this quarter? | The AMC register with renewal dates. |
Numbers that matter
- Cost performance index (earned value over actual cost) by project, and forecast at completion.
- Certified but unbilled work and RA bills pending certification.
- Retention outstanding and DLP expiry dates.
- Open snags and non-conformances on projects nearing their planned end.
- Receivables ageing by client.
Controls an owner cares about
- No bill on uncertified work. The review check comes before the invoice.
- No handover without a signed packet. It is the only way to start the DLP clock.
- No retention release inside the defect period. The release is refused until it ends.
- Makes are enforced. An approved make list is checked at PO and at receipt.
- Margin advice is recorded on the variation so approvals can be reviewed later.
Applications switched on
Your words, on day one
| Generic term | In your Kinnow |
|---|---|
| progress invoice | RA bill (or milestone / progress invoice) |
| defect list | snag (or punch / defect) |
| site quantities | Measurement Book (MB) |
| warranty period | DLP (defect-liability period) |
| post-handover contract | AMC / O&M / LTSA |
| location | plant / project / site |
Questions
Can an RA bill go out on uncertified quantities?
No. The RA-Bill Reviewer checks certified quantities against the Measurement Book and the contract first, and an RA bill is raised from what the consultant has certified. The reviewer holds a bill back; it never posts one.
How do variations and retention work?
A variation is judged before it is approved: its margin against the margin the job was won at, the cumulative variation share of the contract, and whether it has a sell value but no cost estimate. The advice is recorded on the variation. Retention is held in its own separate account, with a defect-liability tranche that cannot be released before the period ends, and a watch warns 30 and 7 days before it does.
Can we stop equipment being bought outside the approved make?
Yes. A purchase order line or goods receipt for a make that is not approved is blocked, so the design and the warranty are not voided on site. A supplier must also be qualified before a purchase order is released.
What happens after handover?
Handover needs a signed packet, which starts the defect-liability clock. Handed-over assets enter the Maintain register under AMC with their OEM warranties, and an AMC contract is created in Leases & contracts (Pact). Snags found later are logged against the punch list.
Does it handle the Construction Industry Scheme?
Only in part. The CIS registration is tracked with a due date and a reminder for a company flagged as construction. Kinnow does not calculate CIS deductions on subcontractor payments or prepare the monthly return, so keep those on your current process.