KinnowKinnow
Sign in
Manufacturing · UAE & Saudi Arabia

ERP for manufacturing. BOM to dispatch, with variance and job work reconciled as you go.

From bill of materials to dispatch, with material variance and subcontract balances reconciled as you go instead of at the quarter-end. The UAE and Saudi Arabia edition opens from December 2026.

From December 2026
Short answer

How does Kinnow help a manufacturer in the UAE or Saudi Arabia? The bill of materials, the work order, the material issued and the finished lot sit in one record, so the cost of a run reaches the ledger and the gap between planned and actual material shows up the week it happens. Around it sit UAE VAT and wage-file preparation, with Saudi Arabia following VAT first. Nothing is filed, paid or posted without a person.

Your business in one paragraph

A plant in Sharjah, Jebel Ali or Riyadh turns a purchase commitment into a shipped batch. Raw material arrives against a purchase order, often imported, goes to the line against a work order, some of it goes to a subcontractor and comes back, and the finished lot is costed and dispatched. The owner's worry is rarely the machine. It is the paper around it: what the BOM says, what was actually issued, what is lying with a subcontractor, and what the planner promised a customer.

Material drifts from the BOM

Actual use creeps above plan and nobody sees it until a costing review weeks later.

Material out with subcontractors

Stock at an outside processor is reconciled by hand, and the balance is nobody's number.

A whiteboard for capacity

A rush order breaks the schedule because nobody could see the load on each work centre.

Send us one BOM and one work order and we will show the variance on your own numbers.

How your month runs on Kinnow

This is demand to dispatch, with the buying and subcontract loops that sit under it. Amounts below are in dirhams for a UAE company.

#StepWhoApplicationWhere a person signs
1Order received; credit check holds it if the customer is over limitSales managerSellCredit hold cleared by a person
2Advisory MRP (material requirements planning) breaks the bill of materials down against stock and open orders and proposes what to make and buyProduction plannerMakePlanner confirms; nothing is released automatically
3Requisition, purchase order, supplier qualified before release; a supplier outside the UAE is set up before the order goes outProcurement officerBuyPurchase order above AED 500,000 needs approval
4Material received; inbound QC inspection created on acceptance; failures raise an NCRStores, QC inspectorStock & Ship, MakeDisposition of an NCR approved
5Work order released; the finite-capacity board shows load per work centreProduction plannerMakeRun above 5,000 units needs approval
6Material issued; operators start and complete operations at the terminalShop-floor operatorMakeOperator named on each operation
7Subcontract: material goes out to a processor and comes back; the agent reconciles sent against consumed, scrapped, returned and still outStores, subcontract coordinatorMakeShort-close or write-off is a person's action
8Work order completes; the cost of the run moves from WIP to finished goods in the ledgerAutomaticAccountCost variance reviewed by finance
9Scrap above the limit is flagged; write-offs go for approvalPlant headStock & ShipWrite-off above AED 100,000 needs approval
10Dispatch and tax invoice; quarter-end VAT return (groundwork completed before launch); month-end closeAccounts executive, finance headSell, Comply, AccountReturn and close signed by a person

The ready-made setup for your industry

The ready-made setup for manufacturing (we call it an industry pack) defines 6 limits, 4 sign-off routes (who approves, in what order), 9 report codes, 13 starter questions for Ask Kinnow, 10 agents and 20 step-by-step routines. For the UAE, a country setup adds 7 limits, 6 sign-off routes, 3 VAT report codes and 13 starter questions of its own. The figures are starting values that you set, held in your own currency.

LimitEffectWhy it is there
Production run above 5,000 unitsNeeds approvalCommits material and machine time before anyone sees demand
Purchase order above AED 500,000Needs approvalRaw-material buying is where margin is set or lost; an import is self-accounted under reverse charge (you account for the VAT yourself), so the supplier must be right first
Stock write-off above AED 100,000Needs approvalA real loss or a stock error; for goods held in a designated zone it is also a VAT question
Manual journal above AED 500,000Needs approvalMoves the books, and the accounting profit that corporate tax starts from, without a source document
Scrap above 50 units on a work orderWarningScrap is material already paid for and thrown away
Credit limit above AED 1,000,000WarningCredit is a decision, not data entry
VAT return with large net payableNeeds approvalFiling is irreversible and the money leaves

Routines include Demand to dispatch, Buying raw material, Enquiry to confirmed order, Stock count to write-off, Stock transfer between warehouses and Obligation to filed, beside month-end close, payroll and access requests. For a Saudi company the Saudi country setup carries its own limits, for example SAR 250,000 on a purchase order and SAR 50,000 on a stock write-off.

Processes, built in

A full set of best-practice processes for your industry come switched on: who owns each step, which steps Kinnow enforces, and a clock on every hand-off between departments. Print any of them as an SOP.

Demand to dispatchMonth-end closeAccess request to grantWorkflow change to liveDocument to signedSee the processes →

Ask us to walk a work order from BOM to finished lot on your own item.

Agents for Manufacturing

Build / Make

BOM Variance

Flags jobs where the material actually used differs from the plan by 5% or more, up or down.

Helps: Production planner
Make

Production Schedule Optimizer

Orders work orders by shortest processing time, as a suggestion for a planner to adopt.

Helps: Production planner
Make

Material shortage

Checks a work order's components against stock on hand and shows the shortfall before the order is released.

Helps: Production planner
Make

Costing variance

Compares a work order's actual cost with plan and flags material overruns beyond the band you set (10 per cent by default).

Helps: Finance manager
Make

Subcontract reconciliation

Tracks material lying with each outside processor and chases balances that have not come back.

Helps: Stores / subcontract coordinator
Make

Work-centre capacity watch

Says when to open the capacity board. A load that looks comfortable while orders are unrouted is reported as unreliable, not healthy.

Helps: Production planner
Stock

Stock Forecaster

Forecasts demand for the next 30, 60 and 90 days for each item and warehouse, with a suggested safety stock and reorder point. It never acts on its own.

Helps: MIS / data analyst
Buy

3-way match

Matches the purchase order (PO), the goods receipt and the supplier's bill line by line, and holds the bill until any difference is sorted out.

Helps: Accounts executive

Each agent is validated with each client before it works on their books, and every output waits for a person.

Tax and compliance calendar for a manufacturer (UAE and Saudi Arabia)

Kinnow prepares; a person confirms and files. Dates are not printed because the authority sets them; Comply carries your calendar. This is what the first release covers, and it is not live today.

ObligationWhat Kinnow preparesWho confirms
UAE VAT return (VAT-201), quarterlyThe groundwork for a return document built from your sales and purchase records, with output tax by emirate, reverse-charge boxes and imports, completed before launch. You download it and submit it on the tax authority portal; Kinnow does not fileFinance head
Tax invoice with your TRN (tax registration number)An English or Arabic tax invoice, checked for the mandatory fields before it is renderedAccounts executive
Import purchasesImported bills captured so the tax owed under reverse charge and the recoverable tax appear on the same return; landed-cost vouchers add freight, duty and clearing to stock valueAccounts executive
WPS salary file (the wage-protection file)The Salary Information File for the factory payroll, produced from the approved pay run. Confirm the layout with your bank before first useHR head
End-of-service gratuityMonthly accrual of the payout owed to non-national staff when they leave, shown for finance to post. Pension contributions for UAE and GCC nationals are computed in the pay runHR head, finance head
Corporate taxA computation of tax due from the taxable income you supply, with the 0 per cent band, small business relief and the split for qualifying free-zone companies. The return itself is not builtFinance head, tax adviser
Saudi VATVAT at 15 per cent on invoices and a return builder whose row mapping is still to be checked. Saudi e-invoicing, payroll and social insurance are not in the first releaseFinance head

Tell us about a quarter of your purchases and sales and we will show you how the VAT return will be drafted.

What the owner sees

Questions that come with your industry setup, typed into Ask Kinnow. Each answer names its source report and its cost before it runs.

  • Which work orders are behind schedule? Which work orders have no routing at all? (Work-order schedule)
  • What is my BOM cost variance this month? Which runs are over their cost variance? (Production cost variance)
  • Which materials are short for the next run? (Stock valuation)
  • What failed inspection this month? What NCRs were raised? (QC inspection register, NCR register)
  • What is my net VAT position this quarter? Which supplier invoices are missing a TRN? (VAT sales and purchase registers)
  • Which purchases this quarter came from suppliers outside the UAE? (Buy)
  • How much stock am I holding at each warehouse? (Inventory)

Illustration · sample data

Work order · itemMaterial plannedMaterial issuedVariance
WO-0412 · Pulley housing, Sharjah plant120.0 kg128.5 kg+7.1%
WO-0415 · Gear blank64.0 kg65.0 kg+1.6%
WO-0419 · Shaft sleeve48.0 kg47.5 kg-1.0%

Numbers that matter

NumberReportWhat it tells you
Material and cost variance by runProduction cost varianceWhich runs overspent and on what
Output by item and lineOutput by itemWhat each line actually produced
Inspection failures and NCRsQC inspection and NCR registersWhere quality is leaking, and from which supplier
Load per work centre, above 100 per cent shown as it isWork-order schedule, capacity boardWhether the shop is over-promised
Net VAT for the quarter and VAT by rateVAT sales register, purchase register, rate summaryWhat you owe or can recover before the return is drawn

See load per work centre on your own routings.

Applications switched on

Generic termIn your Kinnow
production orderwork order
work in progressWIP
outside processingsubcontract / job work
quality failureNCR (non-conformance report)

Questions

Does Kinnow run MRP?

Yes, as advisory MRP. It breaks multi-level BOMs down against stock and open orders and proposes what to make and buy. It never creates a purchase order or work order by itself. A person releases the suggested work orders.

Does it schedule the shop automatically?

No. A finite-capacity board shows the load on each work centre, and it can show more than 100 per cent because that is the fact a planner needs. The Production Schedule Optimizer suggests a sequence for the planner to accept or change.

Can it handle subcontracting?

Dispatch and receipt are tracked per movement, and a reconciliation agent checks that sent equals consumed plus scrapped plus returned plus still out. It reports; a person decides any short-close.

How are imported raw materials handled for VAT?

A purchase from a supplier outside the UAE is self-accounted under reverse charge, so the tax owed and the tax recovered appear on the same return. The purchase order limit asks someone to check the supplier set-up before the order goes out. Customs entries are not handled in Kinnow.

Is there a shop-floor screen?

Yes. A terminal lets an operator start and complete an operation. The time is taken from the clock, not typed, and an out-of-sequence or double start is refused. It works in the phone browser; there is no offline mode or native app.

Will it file my VAT return?

No. The groundwork to build the return from your records, for a person to download and submit on the authority portal, is completed before launch. The layout is checked with an adviser before a first filing.

How long to set up?

About two weeks to first results for one company, once the edition opens in December 2026: masters, BOMs and opening stock in week one, agents and a first close in week two.

Show me Kinnow for manufacturing.

Answer three questions. Get the applications, the agents and a two-week plan for your business.

Book a walkthrough