Project handover fills the asset register

When a project is handed over, its assets join maintenance automatically, with warranties and maintenance contracts attached.

Live
Short answer

What does Construction-to-maintenance continuum do? Developers and facility managers skip re-typing everything between construction and operations.

How it works

At handover, every asset goes into the maintenance register under the right company, already linked to its maintenance contract and manufacturer warranties. Repeating a handover never creates duplicates, and a failure is tried again rather than lost. Assets are then grouped by location and function, so costs and downtime add up.

The detail that makes it real

A repeated handover never creates duplicate assets, because each project and asset tag is recorded only once.

Step by step

  1. The project team lists the assets in the handover packet. Each asset has a tag, a name, the make and model, and the manufacturer warranty period.
  2. The packet is issued and signed. The customer signs the packet. Unfinished items are counted when the packet is issued, and handover is refused if the packet is unsigned, unless the owner deliberately allows that.
  3. Sign-back is recorded. The project manager records that the customer accepted the handover. This starts the defects period and hands the assets over to maintenance.
  4. Maintenance registers each asset. Every asset in the packet enters the maintenance register under the right company, marked under maintenance contract, with the manufacturer warranty recorded from the packet.
  5. A repeat does nothing harmful. Each project and asset tag is recorded once. If the same handover arrives twice, no duplicates appear. If it fails, it is tried again and then parked for follow-up, not dropped.
  6. The facilities team takes over. Assets are grouped by location and function, so work orders, costs and downtime add up where you expect them.

See a handover packet turn into an asset register on sample data.

What you see on screen

Two places: the project handover screen, and the maintenance asset register.

Screen or buttonWhat it shows or does
Handover and retention (project)The defects period and its end date, the two separate retention amounts (performance and defect liability), open snags as at the date the packet was issued, the signing envelope, and a Record sign-back button.
Release earlyLets you release defect-liability money before the period ends. It has to be ticked deliberately and says what you are accepting.
Asset register (maintenance)Each handed-over asset with its tag, location, lifecycle stage, linked maintenance contracts and warranty.

Who uses it

WhoWhen
Project manager or site headPrepares the packet and records the customer's sign-back.
Facilities or maintenance headReceives the register, sets up routine maintenance and tracks warranties.
Finance headWatches the retention release dates tied to the defects period.

Related

Questions

What is Construction-to-maintenance continuum in Kinnow?

When a project is handed over, its assets join maintenance automatically, with warranties and maintenance contracts attached.

What changes for the business?

Developers and facility managers skip re-typing everything between construction and operations.

Is it available today?

Yes, it is live.

Do I have to type every asset again after handover?

No. The assets listed in the signed handover packet become asset records in maintenance, with the warranty period from the packet. You then assign maintenance routines to them.

What if the handover is sent twice by mistake?

Each project and asset tag is recorded only once, so the second one adds nothing. If the first attempt fails, it is retried rather than lost.

Ask about this

Have a question about Project handover fills the asset register?

Ask in your own words. We take your work email first, then answer from what Kinnow does today.

Tell Kinnow what slows you down.

Answer three questions. Get the applications, the agents and a two-week plan for your business.

Book a walkthrough